One workload remains on the old control plane after a mesh revision switch.
A service mesh revision switch succeeds and one workload still routes to the old control plane because its sidecar bootstrap retains the retired discovery host
Revision labels are correct, but one workload keeps using the previous discovery address embedded in its bootstrap config.
Scenario
What to check first
- Identify the primary failure signal in the The City Opened the New Control Tower and One Aircraft Took Off Using the Frequency Card That Was Taped Beside the Cockpit Window on the Old Fleet scenario.
- Separate visible symptoms from the underlying technical dependency.
- Describe the safest recovery path and the follow-up prevention work.
Checking checklist
- Summarize the current impact and the last known change.
- Collect direct evidence from logs, runtime state, and configuration before changing anything.
- Separate immediate recovery from permanent prevention work.
Recovery and prevention
Inspect sidecar bootstrap state before relabeling namespaces again.
Questions worth viewing together
No. Keep commands, logs, file names, APIs, and product names unchanged, then explain the reasoning in the selected UI language.
State the root cause, the evidence that supports it, and the safest recovery direction.
The source scenario is treated as an incident artifact. Guidance, checklist, hints, and explanations can be localized around it.
Similar cases seen in the field